National award-winning project for the replacement of an existing four-span concrete girder bridge, initially built in 1962 over Lake Linganore, with a new 300′ long, two-span, prestressed concrete girder bridge. New bridge carries two lanes of traffic, a sidewalk, and 5′ wide shoulders to accommodate bicycles. Also includes bulkheads at each abutment to retain embankments and maintain existing trail system around the lake.